Heilbronn, Stadttheater

Reconstruction of upper machinery

New electronic control system satisfying the requirement class 5 according to DIN V 19250

  • 27 pcs. fly bars, payload 750 kg/1500 kg, lifting speed 1.2 m/s / 0.6 m/s
  • 4 pcs. side bars, payload 750 kg, lifting speed 1.2 m/s
  • 20 pcs. vertically moveable point hoists, payload 250 kg, lifting speed 1.2 m/s
  • 2 pcs. lightning bars, payload 1500 kg, lifting speed 0.6 m/s
  • 6 pcs. backstage fly bars, payload 300 kg, lifting speed 0.6 m/s
  • 1 pc. sidestage fly bar, payload 300 kg, lifting speed 0.6 m/s
  • Reconstruction of manual fly bars, reconstruction front stage bars
  • Electronic control system TTS EMS II, satisfying the requirement class 5 according to DIN V 19250