Göggingen, Kurhaustheater

Reconstruction of upper machinery, lower machinery and safety system

  • Orchestra elevator with spiralift
  • Portal bridge with electronic drive
  • 17 pcs. fly bars, payload 300 kg, lifting speed 0,05 / 0,15 m/s
  • 2 pcs. lightning bars, payload 1000 kg, lifting speed 0,05 / 0,15 m/s

Project Photos