Oldenburg, Staatstheater

Redevelopment of upper and lower machinery

New electronic TTS EMS IV stage control system acc. to SIL3 of IEC 61508, with incorporation of existing lifting platforms with hydraulic drives.

Renewal including fly loft, roller loft, machine loft and forestage fly loft. Steel construction Reinforcements regarding beam trusses. Rebuild of working platforms.

  • 31 pcs. point hoist, 500kgs max. payload, speed up to 1,2 m/s
  • 1 pc. hoist for sound-absorbing courtain, 800 kgs max payload, speed up to. 1,2 m/s
  • 2 pcs. hoist for veil-curtain, 500kgs max. payload, speed up to 1,2 m/s
  • 4 pcs. hoists vor heavy loads, 1000kgs max. payload, speed up to 0,7 m/s
  • 4 pcs. batten hoists, 1200kgs max. payload, speed up to 0,6 m/s
  • 2 pcs. panorama hoists, 500kgs max. payload, speed up to 1,2 m/s
  • 2 pcs. gallery hoists, 250kgs. max. payload, speed up to 0,6 m/s
  • 1 pcs. speaker hoists, 250kgs. max. payload, speed up to 0,6 m/s
  • 14 pcs. point hoists, 500kgs. max. payload, speed up to 1,2 m/ss
  • Scissor track system for main curtain with vertical Guidance (Guillotine style curtain)
  • 2 pcs. orchestra platforms with Serapid-drives
  • renovation of the stage floor, commonm stage lightning, ELA-Systems

Project Photos