Stralsund, Theater

Reconstruction of upper and lower machinery, safety equipment.

New control system satisfying SIL 3 according to IEC 61508

  • Fly- and pulleyloft, working galleries, staircases, static steel construction in the lower machinery
  • Static portal towers, mobile portal towers, portal brigde with electrical drive, curtain system
  • 21 pcs. manual flybars, payload 250kg each
  • 21 pcs. electronic flybar, payload 350kg each, lifting speed 1.2m/s
  • 1 pc. sidebar, payload 500kg ea., lifting speed 1.2m/s
  • 1 pc. sound curtain, payload 500kg ea., lifting speed 1.2m/s
  • 1 pc. lightning bar, payload 350kg ea., lifting speed 1.2m/s
  • 2 pcs. orchestra elevator with drivechains
  • 1 pc. electrical revolving stage, 11.5m diameter
  • 1 pc. electrical revolving ring
  • 2 pcs. smoke hoods for the stage
  • New drive for iron curtain
  • Electronic control system TTS EMS III satisfying SIL 3 according to IEC 61508