Bamberg, E.T.A. Hoffmann-Theater

Reconstruction of upper machinery

New electronic control system satisfying the requirement class 5 according to DIN V 19250

  • Trusses, fly- and pulley loft, working galleries, portal towers, portal bridge with hydraulic drive, curtain system
  • 1 pc. sound curtain, payload 500 kg, lifting speed 1.0m/s
  • 1 pc. manual veil curtain, payload 300 kg
  • 1 pc. manual portal fly bar, payload 300 kg
  • 7 pcs. fly bar, payload 500 kg, lifting speed 1.0 m/s
  • 20 pcs. manual fly bars, payload 300 kg
  • 2 pcs. lightning bars under the galleries (manual winches)
  • 4 pcs. back stage fly bars (manual winches)
  • 1 pc. front stage fly bar, payload 500 kg, lifting speed 1.2 m/s
  • 1 pc. chandelier hoist, payload 500 kg, lifting speed 1.2m/s
  • Electronic control system TTS EMS II satisfying the requirement class 5 according to DIN V 19250

Project Photos